Find helpful information about your LG Product through our Help Library. Find helpful information about your LG Product through our Help Library.

Help Library

Find helpful information about your LG product

[LG Air-Conditioner Power] [First Use of Product after Installation] The air-conditioner is turned off by itself. The louver opens, and then closes after a while. The air-conditioner is not turned on

Troubleshooting

If test run after installation of the product is not normally performed, No message may be displayed, or the product is turned off soon after installation.
Carry out test running of the product.

What is a test run?
This is the function with which the product checks the product’s condition while operating by itself.
Products in which test running was not performed do not operate normally.

Product symptoms when a test run is not performed

1. An error code occurs in the product. [No display]

2. 3 LEDs blink continuously at the same time.

3. The louver opens and then closes after a while, or it does not work.

➔ Test run of the product might not normally performed if the same symptom persists immediately after installation.
You may ask test run to installation technician, or you can perform test run by yourself.

Checking the display for a “test run not performed” error

➔ Failure of test run displayed on LED lamps, Failure of test run displayed on LED lamps [Three LED lamps turned on simultaneously]

LAir conditioner trial operation mode display image

Try this

Test running

➔ Test running of LED type

1. Open the louver of the indoor unit.

Indoor unit wind blade opening image

2. Keep pressing the forced operation switch on the right of the product for 3 to 6 seconds.
Test run starts once you opt out from the switch when ‘cling’ sounds once from the product.

After opening the wind blades of the indoor unit, press the forced operation switch located on the right side of the product for 3 to 6 seconds to hear a ding sound.

3. “Lo” is displayed for approximately 3 minutes during test run, and progress ratio of the required test run is displayed in numbers between 1 and 99 for approximately 4 minutes.
EN is immediately displayed, and the selected mode is automatically executed for approximately 10 minutes.
Wait until the test running is completed.

approximately. 3 minutes Lo display/approx. 4 minutes 00-99 display/approx. 10 minute EN display

[required operation]: It takes approximately 0 to 3 minutes.

[required operation]: It takes approximately 4 minutes.

[optional operation]: It takes approximately 10 minutes.

Warning!

Do not press the forced operation switch or a remote control button during test running.
The product does not operate normally if it is terminated before completing the required operation.
If you press the button, the test run may be stopped before completion.

In case of check codes CH 05, 38, 53, 66, 90, and 91

If any of the check codes is displayed, have the installation technical check the products for erroneous wiring of power cables, or status of refrigerant during installation of the product.
It is recommended that you check the product status after having an installation technician check the installation status first.

This guide was created for all models, so the images or content may be different from your product.

*Required question